We're excited to announce the successful completion of a major lighting upgrade at a warehouse in Derbyshire, aimed at boosting energy efficiency and sustainability. Here's a quick look at what we achieved:
Replaced existing 400W SON halogen fittings with FORZA LED high bays for a more energy-efficient solution.
Step dim functions reducing the lighting down to 10% when movement isn't detected.
Integrated PIR sensors and remote programmability for better control and energy savings.
All new lighting was commissioned at ground level via remote control, ensuring safety and efficiency.
Correct disposal of old fittings/lamps, ensuring eco-friendly practices.
Access provided by UK Tool Hire, ensuring smooth operations throughout the project.
Conformance with CIBSE requirements for lighting levels, ensuring operatives have optimal visibility when picking from warehouse racking.
Custom-built channel bracketry constructed for secure light suspension.
Completed in a 24/7 operational environment, operating around fork trucks and warehouse staff minimising disruption to the business
A great energy saving reducing from 20,800W to 8,944W, significantly lowering their carbon footprint and providing substantial cost savings.
Huge thankyou to our operatives for working seamlessly and efficiently!
This upgrade is a fantastic example of how thoughtful lighting design can reduce costs, improve productivity, and support environmental goals. 🌍💡
We look forward to seeing further savings and efficiency at this site in future!
#EnergyEfficiency #Sustainability #WarehouseLighting #LEDUpgrade #CarbonFootprint #CIBSE #EnergySavings #FacilityManagement #Innovation #Derbyshire #ElectricalContractors
Comments